Davidson Bros Electrical - Solar, Pumps, Motors

Ph: (02) 67 66 11 88
  • Home
  • Services
  • Products
  • Case Studies
  • Our Staff
  • Contact

2022 underground power

The Davidson Bros Electrical team utilised our earthmoving equipment and trencher to connect underground power to a home in the hills of Limbri.

Related topics:

  • domestic applications
  • electrical contracting
  • rural

Case Studies

  • 2022 underground power
  • A new service pole for new main switch board
  • A new solar bore pump
  • A newly designed lighting system for a tennis court
  • A power upgrade
  • Baraba Water – Tamworth Regional Council
  • Boral Contract Crushing
  • Bore Testing
  • British Aerospace Engineering (BAE)
  • Design & Construct Motor sizing for output auger for grain silo
  • Fitzroy St Redevelopment, Tamworth
  • Gunnedah Shire – Curlewis Water
  • New water supply for Murrurundi
  • Solar Pumping Hillville
  • Solar PV Grid Connect
  • Tamworth Container Packing Folder
  • Tamworth Regional Council
  • Tamworth Regional Livestock Exchange
Search
Our Partners
© 2022 Davidson Bros Pty Ltd | ABN 93 100 000 655 | Site by: Unconundrum.net